Public Content Library

1572 Entries
 
 
3 months ago
Be the first person to recommend this.

Summary

The University of Minnesota increased resiliency on their campus by migrating legacy control systems for their Southeast Heating Plant while integrating SCADA controls into ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Technical, economic, environmental and resiliency merits of CHP systems for power and heat. Presentation will address some of the suggested conference themes including how ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Waterside scale deposits in steam boilers can have a dramatic impact on fuel efficiency, boiler structural integrity, and maintenance costs for the steam plant operation. ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

St. Joseph’s Hospital Health Center planned a $200 million-dollar expansion that was projected to “max out” the capacity of the existing infrastructure, forcing the hospital ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Capacitive Deionization technology is used to reduce dissolved ion concentration, thus lowering the makeup water conductivity prior to use in an evaporative cooling system. ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Ice storage can be ideal for land-locked campuses while enabling modular district cooling system growth. Using University of Arizona & New Mexico State examples, presenters ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

The Virginia WaterHub® is producing 650,000 GPD of Level 1 Reclaimed Water per State of Virginia standards for a Fortune 100 and FDA regulated manufacturer. The system is ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Over thirty blackwater reuse systems produce fit-for-purpose non-potable water in the Northeast, and some have been online for more than 25 years. The high cost of water ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

This $240M project upgraded the Central Utility Plant and replaced the entire utility distribution network for the entire campus. The energy distribution systems were upgraded ...

Attachments
3 months ago
Be the first person to recommend this.

Summary

Working with (instead of against) the campus Architect can result in a successful Thermal Energy Storage (TES) tank project that saves energy costs for the owner, and becomes ...

Attachments